Validate relay behaviour and de-risk novel protection schemes.
Gain confidence in the performance of critical projects with HIL testing.
Perform closed-loop testing via communication protocols.
Simulate and stream IEC/IEEE 60255-118-1 synchrophasors in real time.
Improve the performance of distribution automation systems and DERMS.
Achieve superior resilience through HIL testing of microgrid protection and control.
Test renewable power plant controllers (PPCs) in a closed loop, including communication delays.
Test controls in a closed loop with simulated high-frequency switching circuits.
Test DERs, motors, loads, and other real power hardware in a controlled environment.
Prevent and survive cyber events via thorough real-time testing.
Validate the performance of novel technologies and improve operator confidence.
Start here to learn about real time simulation and discover the technology that makes hardware-in-the-loop testing possible.
NovaCor™: the powerful, custom-developed hardware platform at the heart of the simulator.
Exchange data with external devices in real time through Ethernet and Network Interface Card.
The most diverse, robust, and accurate real time power system modelling library available.
RSCAD® allows the configuration, execution, and analysis of real-time simulations.
Learn about EMT simulation, the Dommel algorithm, and multi-rate simulation.
Learn how real time simulation supports power system innovation around the globe.
Join our mailing list to get everything “RTDS” in one place: from webinar announcements, industry news, and event details.
Technology updates, conferences, training courses and webinars, and other news.
See what events are on deck at RTDS Technologies.
Check out our schedule for training at our facility in Winnipeg, Canada.
RTDS Technologies changed the power industry forever by introducing the world’s first fully digital real-time power system simulator.
Leaders in their craft & main drivers of our innovation – simulating the grid of tomorrow.
Discover opportunities to join the world-class team at RTDS Technologies.
Easy access to technical papers, product & application information, and more.
Hands-on training opportunities and unparalleled user support.
Accessible, comprehensive equipment maintenance to eliminate downtime.
Video training resources for RTDS Simulator users.
Easy access to technical papers, product & application information, and more.
Hands-on training opportunities and unparalleled user support.
Accessible, comprehensive equipment maintenance to eliminate downtime.
Access our client area with your credentials here.
Guest article by J-Power, Japan
It has been nearly 40 years since the commissioning of the Hokkaido-Honshu HVDC link, which is a bipolar, +/-250kV, 600MW DC system with submarine cables (laid across the Tsugaru Strait) and overhead lines linking Japan’s two major islands. The refurbishment of Pole #1 has already been undertaken, with the analogue controller replaced with a digital system in 2008. The control and protection (C&P) system of Pole #2 has since become obsolete since more than 25 years has passed. This article details the upgrading of the Pole #2 system with the support of the RTDS Simulator.
The refurbishment work was awarded to the two major Japanese manufacturers who built the original link. One manufacturer was responsible for the C&P system on the Hokkaido side (Japan’s Northern island) and the other was responsible for the Honshu side (Japan’s Main island). Because of this unique multi-vendor system configuration, it was very important to test if the new control systems operated properly together before their installation on both sites.
Hardware-in-the-loop (HIL) testing of the Pole #2 C&P system was conducted using the RTDS Simulator, which is installed at R&D centre of J-POWER, located in Chigasaki city, Kanagawa Prefecture. In Chigasaki, the new telecommunication scheme was also set up and connected with the control and protection system to establish test conditions which were as close as possible to the real HVDC system in terms of signal flow and transmission time delays.
The simulator represented the main circuit including the AC systems, HVDC overhead lines, cables, valves, and other DC equipment. The tests at Chigasaki were run from July until the middle of September 2019; more than 550 test cases were carried out to verify functions of the C&P system.
Experience from testing Pole #1 in 2008 encouraged J-POWER to take a more sophisticated approach for Pole #2. In addition to the easy handling of the simulator, numerous fault points were prepared in advance in the test system by adding fault switches and triggering buttons.
This scheme greatly accelerated the test procedure, enabling J-POWER to complete all of the planned tests within the limited period. These intensive tests greatly helped to verify the C&P system functionality and contributed to improve system reliability.
In fact, several control and protection operations were improved before sending the equipment to the both converter stations, including parametric adjustment of pole control blocks. The HIL tests greatly saved time and expenditure related to discussions and parameter adjustments that otherwise would have been made across the Tsugaru Strait. The refurbishment works of Pole #2 will be completed by the end of June 2020.
Click here to log in to the RTDS client area where you can access the full RSCAD release notes.
The second all-Russian open competition featuring student qualifications and scientific research works has finished. Thirteen participants — students and aspiring students — from four Russian universities used the RTDS Simulator to explore various research topics. The competition showed students are now applying real-time digital simulation to even more creative and skillful applications than ever before. The event was organized by EnLAB: Russia’s exclusive representative for RTDS Technologies.
In May 2018, the Public Service Company of New Mexico energized a transmission line protected by travelling-wave based protection with the trip circuits live to the breakers in a landmark project. Learn more about that here. The relays were provided by Schweitzer Engineering Laboratories (SEL) and tested using the RTDS Simulator in order to provide the customer with the confidence to deploy the technology.
In September 2019, the installed relays detected a B-phase-to-ground fault, shown to the right. Both SEL-T400L relays successfully tripped their respective circuit breakers. The Cabezon SEL-T400L tripped in 1.56 ms, and the fault cleared in 24.36 ms —less than 1.5 cycles. The San Juan SEL-T400L tripped in 2.21 ms, and the fault cleared in 23.53 ms. As a result of the extremely short SEL-T400L trip time, the actual fault-clearing time is essentially the time for the breaker to open, which in this case was under 2 cycles. Learn more from SEL.
© 2023 RTDS Technologies Inc AMETEK. All Rights Reserved.